Home Backup Power Stations

Keep a refrigerator, well pump and sump pump running through any outage: the 3.6–5.4kWh LFP flagships run 7,200W when paralleled, charge an EV in an emergency, and hold 85% output at -10°C.
Product Images


Highlights
Two flagships in parallel = 7,200W — run fridge, well pump, lights and AC starter loads together.
Plus variant outputs 120V/30A — level-1, get-home miles when the grid is down.
85% output retention at -10°C on cold-weather models.
Add expansion batteries or 2,400W solar input instead of buying a new unit.
Applications
Full Specifications
| Item | Specification | Evidence |
|---|---|---|
| Flagship (Plus) | 3,686Wh LFP; 3,600W; parallel 7,200W; EV output 120V/30A; expansion-battery port | T2 · Catalog |
| Mid flagships | 1,024–2,048Wh; 1,800–2,400W; -10°C at 85% output | T2 · Catalog |
| Outdoor model | 2,074Wh NCM; 3,600W; IP65; 22kg; 5× overload | T2 · Catalog |
| Solar input | Up to 2,400W on flagships (10–150Vdc MPPT) | T2 · Catalog |
| UPS transfer | ≤25ms | T2 · Catalog |
| Runtime math | Fridge 1–2+ days; CPAP many nights; well pump per LRA check (calculator in quotation pack) | T3 · Field data |
Evidence codes: T1 = factory specification sheet, T2 = product catalog, T3 = field/case data. Runtimes are engineering estimates by load.
Four product lines — vehicles, energy storage, farm machinery and engines — from long-established Chongqing manufacturing bases, exported through one channel under one QC standard.
- One mixed container — vehicles, batteries, machines and spares ship together; 220+ SKUs on one loading plan cuts freight and admin cost per line.
- One QC & export standard — factory specification sheet and certification status attach to every quotation, answered within 24 hours.
- Field-proven flagship tech — immersion-cooled storage in oilfield service since 2022 at 8.1% of diesel energy cost.
- SKD / CKD routes — local-assembly programs ready where import policy requires them.
How to Choose
- Load list first — refrigerators, sump pumps and CPAP have different surge profiles; size from the appliance list, not the marketing wattage.
- Expandability — dual-unit parallel (7,200W class on the home backup line) doubles output without doubling SKUs.
- Channel fit — retail shelves need NA/EU certification packs (UN38.3, ETL-UL, FCC, CE); ODM programs take the same platforms private-label.
Where this line sits
The home backup line sits at the household end — essential-load backup with parallel-ready architecture.
Portable & Home Backup Finder
| Line | Class | Duty | Best for |
|---|---|---|---|
| Portable Power Stations | 179Wh–5.4kWh LFP | Portable power, two manufacturing lines | Retail, dealer shelves, ODM |
| Home Backup Stations | Home-class capacity, dual-unit 7,200W | Essential-load home backup | Outage-prone grid markets |
| ODM / OEM Programs | 179Wh–5.4kWh platforms | Private-label power stations | Brands & importers |
Compare the full range: Power Station ODM / OEM →
Application & Site Photos
Application photos, company floor and exhibition photos for this line are being prepared — tell us your market and we share the matching site set with your quotation.
How It Performs in the Field
The pain points buyers raise most — and what the line does about them:
- Outage-prone grids make fuel generators costly to run — home backup stations cut noise and running cost for essential loads.
- Portable-class simplicity with home-class capacity: no installation crew required for basic backup setups.
Trade & Ordering Notes
- Mixed loading is standard — mixed models and mixed categories in one container are accepted; per-model MOQ is confirmed in the quotation.
- 24-hour quotations — specification-matched replies on business days, with the factory specification sheet and certification status attached.
- Terms confirmed in writing — payment, production lead time and warranty are fixed per model and destination in the quotation, with no post-signing surcharges.
- Export-ready documentation — HS classification and the export document set are issued per model; SKD/CKD component programs are available where market policy requires local assembly.
How We Work with You
FAQ
Will it run a refrigerator? How long?
A typical fridge cycles well within 3.7kWh — estimate 1–2+ days per full charge, load-dependent.
Can it start a well pump?
Yes — 3,600W+ inverters have surge headroom for pump start loads; check your pump’s LRA before ordering.
What happens during a multi-day outage?
Add expansion batteries or solar input to extend runtime indefinitely.
Can it charge an EV?
The Plus variant provides 120V/30A emergency EV charging — level 1, miles-per-hour class.
Get wholesale pricing for home backup units.
Specification-matched quotation with certification status, replied within 24 hours on business days.
Request a Quote Why Benelabo